Dwanging once more


After the piles were set we built up the subfloor structure. The piles were all cut off to level and the bearers fixed to the piles. The joists were then laid down and fixed to the bearers and finally dwang cut to fix at 1800 centres between the joists. For the anchored piles, of which there are eight, 12kN (kilonewton) galvanised nail-plates were fixed to the pile/bearer connections.