On Tuesday the ridgebeam arrived with the rafters. We managed to overcome this hurdle without too much difficulty as the HIAB (truck crane) was able to set the beam in place within its maximum reach. It is temporarily braced at the moment and soon the rafters will hold it in place.
For the remainder of the week we worked mainly on the attic floor and ceiling below. Once that flooring is complete the rafters can be fixed in place.
Jacob unhooks the strop after the beam is set down in place.
Saturday, August 15, 2009