This picture above was taken after a flurry of activity heaving large wheelbarrows often full to the brim with concrete down sticky, muddy, mucky soil to pour around the piles. We set a total of 38 piles including 8 anchored piles set 900mm into the ground.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment