Saturday, January 23, 2010

Linings done

Great things have happened since the last post, which isn't really surprising considering the duration between posts now. The initial enthusiasm to keep these posts up has wained I admit. This is mainly beause it seems I'm making the posts for only myself, however for those out there who have been looking in from time to time: cheers.

Well, All the major building work has been completed. All the interior linings have been done, including the tiling and flooring (vinyl, carpet) and the decking (including the ramp has been built). I will have pictures of these soon.

In this post You can see some of the progress of those additions and a picture showing the fire and gibstopping.




Below is a picture showing what I've been working on personally for the last week or so: the ceiling polyurethane. I've almost completed 2 coats of water-based polyurethane, semi-gloss finish and the picture shows the difference between no-coat, one coat, and two coats, which can only bee seen easily like this when a light source is positioned as shown. That's an awful lot of work for something that can barely be noticed... but there is a lot of that kind of work in building.